2EMA Cross Alert

MQL4 Indikatoren

Auftrag beendet

Ausführungszeit 21 Stunden
Bewertung des Kunden
Good and fast job, thank you!
Bewertung des Entwicklers
Thank you for job, contact me if will be questions, or problems.

Spezifikation

Hello software engineers,

I need an indicator with the following requirements (Standard EMA with an alert function - 2EMA Cross Alert):

1. EMA “fast”: Period, shift, color of the line, width of the line adjustable

2. EMA “slow”: Period, shift, color of the line, width of the line adjustable

3. Both EMAs will be depicted as lines within the chart

4. All time frames, M1, M5, M15 can be selected

So basically the “Standard EMA indicator” until now.
------------------------------------------------------------------------
Additionally, the subsequent alert functions:

5. Alert function: if EMA “fast” cuts the EMA “slow" from the bottom up, an arrow pointing upwards will be depicted in the chart at the respective candle (color of the arrow shall be adjustable).

6. Alert function: if EMA “fast” cuts the EMA “slow” from the top down, an arrow pointing downwards will be depicted in the chart at the respective candle (color of the arrow shall be adjustable).

7. The alert may only be issued once the candle is FINISHED in the respective time frame and the EMAs have cut! (this shall prevent that there are frequent “false alarms” during the creation of the candle).

8. It must be selectable for which time frame an alert is issued (e.g. alerts only for M15 and H1)

9. Alert message: e.g.: Cross Alert H1 EUR/USD

10. Alerts: Message, sound, email individually selectable (true/false).

11. Delivery as a mq4-file.

Regards
Chris

Bewerbungen

1
Entwickler 1
Bewertung
(414)
Projekte
670
33%
Schlichtung
60
17% / 32%
Frist nicht eingehalten
113
17%
Arbeitet
2
Entwickler 2
Bewertung
(728)
Projekte
1048
40%
Schlichtung
47
49% / 23%
Frist nicht eingehalten
84
8%
Frei
3
Entwickler 3
Bewertung
(1097)
Projekte
1778
61%
Schlichtung
14
64% / 7%
Frist nicht eingehalten
84
5%
Frei
4
Entwickler 4
Bewertung
(20)
Projekte
35
23%
Schlichtung
23
17% / 61%
Frist nicht eingehalten
14
40%
Frei

Projektdetails

Budget
50 - 100 USD
MwSt (19%): 9.5 - 19 USD
Insgesamt: 59.5 - 119 USD
Für die Entwickler
45 - 90 USD
Ausführungsfristen
von 1 bis 10 Tag(e)