"MARS INDICATOR": A RECOGNIZE INDICATOR FOR A PARTICULAR GRAPHICS PATTERN

MQL5 Indicators

Job finished

Execution time 1 minute
Feedback from customer
excellent: he responds immediately, is very experienced and competent, immediately understands what you need, and delivers the jobs in a very short time. I advise.
Feedback from employee
Very great customer! I will be glad to continue cooperation.

Specification

NAME INDICATOR TO REALIZE: "MARS INDICATOR"

INDICATOR FOR MT5 THAT SENDS ALERT WHEN THIS GRAPHIC PATTERN IS FORMED

THIS IS NOT A DIFFICULT WORK, YOU NEED TO MAKE AN INDICATOR FOR MT5 THAT SENDS AN ALERT (SOUND AND PUSH NOTIFICATION) WHEN THIS PARTICULAR GRAPHIC PATTERN IS FORMED.

LONG SIGNAL: AFTER A NEGATIVE BEARISH CANDLE (ONE OR MORE CANDLES) A BULLISH CANDLE IS FORMED THAT MUST HAVE:
1) THE MINIMUM OF THE BODY (IF THE BODY CORRESPONDS TO THE MINIMUM) OR THE SHADOW OF THE MINIMUM MUST BE HIGHER (NOT EQUAL, NOT LOWER) THAN THE MINIMUM OF THE PREVIOUS NEGATIVE BEARISH CANDLE;
2) CLOSE WITH POSITIVE BODY
3) THE MAXIMUM OF THE BULLISH CANDLE THAT HAS FORMED (OR SHADOW OF THE MAXIMUM) LOWER THAN THE OPENING OF THE PREVIOUS NEGATIVE CANDLE.
GRAPH EXAMPLE DETAILED IN THE ATTACHED IMAGE 1;

SHORT SIGNAL: AFTER A BULLISH CANDLE (ONE OR MORE CANDLES) A SHORT CANDLE IS FORMED THAT MUST HAVE:
1) THE MAXIMUM OR THE SHADOW OF THE MAXIMUM MUST BE LOWER (NOT EQUAL, NOT HIGHER) THAN THE MAXIMUM OF THE PREVIOUS BULLISH CANDLE;
2) CLOSE WITH NEGATIVE BODY
3) THE MINIMUM OF THE BEARISH CANDLE THAT HAS FORMED (OR SHADOW OF THE MINIMUM) HIGHER THAN THE OPENING OF THE PREVIOUS POSITIVE CANDLE.
GRAPH EXAMPLE DETAILED IN THE ATTACHED IMAGE 2

AVAILABLE FOR ANY DOUBT OR CLARIFICATION.

Files:

JPG
LONG.jpg
57.6 Kb
JPG
SHORT.jpg
70.3 Kb

Responded

1
Developer 1
Rating
(726)
Projects
1046
39%
Arbitration
47
49% / 23%
Overdue
84
8%
Free
2
Developer 2
Rating
(10)
Projects
13
8%
Arbitration
3
67% / 33%
Overdue
0
Free
3
Developer 3
Rating
(23)
Projects
29
14%
Arbitration
3
0% / 67%
Overdue
3
10%
Working
4
Developer 4
Rating
(256)
Projects
417
38%
Arbitration
86
44% / 19%
Overdue
71
17%
Busy

Project information

Budget
30+ USD
For the developer
27 USD
Deadline
from 1 to 5 day(s)